Digital Project Twin for Quantitative Cost, Risk and Schedule Assessment of Capital Projects 
Veranstalter (Körperschaft):
Engineers Australia 
Konferenztitel:
Integrated Project Engineering Congress (2021, Brisbane) 
Tagungsort:
Brisbane, Australien 
Jahr der Konferenz:
2021 
Datum Beginn der Konferenz:
26.05.2021 
Datum Ende der Konferenz:
28.05.2021 
Jahr:
2021 
Sprache:
Englisch 
Stichwörter:
Project Risk Twin (PRT) ; RIAAT (Risk Administration and Analysis Tool) ; Integrated Cost and Schedule Analysis ; Cost Component Structure ; System Integration 
Abstract:
Key processes necessary to identify and manage risks on complex infrastructure projects have been developed over the last 30 years to implement risk-based approaches for better cost and schedule estimation. Cost and schedule were mostly treated separately instead of being integrated into one model. This integration is highly relevant as schedule delays are often the root cause for severe cost overruns. The Project Risk Twin (PRT) process discussed in this paper considers the correct applicatio...    »
 
Fakultät:
Fakultät für Bauingenieurwesen und Umweltwissenschaften 
Institut:
BAU 8 - Institut für Baubetrieb 
Professur:
Sander, Philip 
(Forschungs)einrichtung UniBw M:
RISK 
Open Access ja oder nein?:
Nein / No